Repair of production and industrial building
Repair of administrative (312 kv/m) and factory (6 361 kv/m) premises and production development works:
- Installation of a 68.15 m long, 6 m wide, 2.5 m deep pit;
- Installation of a 6 m deep pit;
- Installation of 5,108 kv/m of new concrete floors;
- Installation of 312 kv / m office premises;
- Production and installation of equipment metal structures and technological frames, used about 100t of metal;
- Press installation and commissioning works;
- Installation of heating, ventilation and air conditioning;
- Electrical installation works.