Installation of biofuel supply from storage to combustion chamber, fire irrigation system

In Klaipėda, Orion Global PET, biofuel boiler house pumping station and biofuel supply conveyors, UAB Genkonta designed and installed a fire-fighting irrigation system. The project used high-quality, reliable and fast installation materials: 1/3 km. steel galvanized corrugated pipes, more than 350 pcs. galvanized ATUSA mechanical (Clamp) connections and fittings, and WILO pump station. Installation works were completed within 3 weeks.